2024-08-29 Meeting notes
Date
Aug 29, 2024
Participants
@Margaret Mellinger
Goals
Define the
Discussion topics
Time | Item | Presenter | Notes |
---|---|---|---|
15 minutes | Business Impact Analysis | Margaret |
|
| A recovery point objective (RPO) is the maximum amount of data loss that would be acceptable to an organization. Data loss tolerance is often measured in terms of time.
A recovery time objective (RTO) is the maximum length of time a computer, system, network, or application can be down following a failure. An RTO is most often measured in seconds, minutes, hours, or days. This sheet is due 9/30, but I’d love to turn it in early. |