Renovation Project (2011-2013)
Existing Building (built 1989-1990)
- Square footage
- Floorplan
- Floorplan Attic - Systems (Architectural Drawing)
- Floorplan Attic
- Floorplan Main Level - Systems (Architectural Drawing)
- Floorplan Main Level (Architectural Drawing)
- Floorplan Main Level (Basic post-2013 remodel)
- Library Network Drops - 2020 Redo
- Guin Shelving Seismic Analysis
Upholstery Projects
2008 Quotes
Renovation Project (2011-2013)
Renovation Project Circ Desk/Reference Shelving Removal 2018
- Project Proposal
- Furniture Order
- WorkPointe Floor Plan
- Mobile Check-In Station
- HMSC Facilities paid for the concrete cutting to create more floor outlets
Renovation Project South Sides of Library and Pods 2020-2021
- Workpointe Invoice
- Workpointe Invoice for Additional Furniture
- Invoice for Furniture in SW Corner
- The original furniture for the SE Corner had pieces that were two different heights.
- Carl Schock purchased the incorrect pieces from WorkPointe and resold them to me at a discount. That's why we could remodel the SW Corner at the same time as the SE
- Additional invoice for furniture to complete the area
Fireplace Installation
Kitchen Remodel
Seminar Room Remodel 2022
- LAMP Proposal
- Proposal Completed Report
...