/
Guin Library Building
Guin Library Building
Existing Building (built 1989-1990)
- Square footage
- Floorplan
- Floorplan Attic - Systems (Architectural Drawing)
- Floorplan Attic
- Floorplan Main Level - Systems (Architectural Drawing)
- Floorplan Main Level (Architectural Drawing)
- Floorplan Main Level (Basic post-2013 remodel)
- Library Network Drops - 2020 Redo
- Guin Shelving Seismic Analysis
Upholstery Projects
2008 Proposal & Quotes
Renovation Project (2011-2013)
Renovation Project Circ Desk/Reference Shelving Removal 2018
- Project Proposal
- Furniture Order
- WorkPointe Floor Plan
- Mobile Check-In Station
- HMSC Facilities paid for the concrete cutting to create more floor outlets
Renovation Project South Sides of Library and Pods 2020-2021
- Workpointe Invoice
- Workpointe Invoice for Additional Furniture
- Invoice for Furniture in SW Corner
- The original furniture for the SE Corner had pieces that were two different heights.
- Carl Schock purchased the incorrect pieces from WorkPointe and resold them to me at a discount. That's why we could remodel the SW Corner at the same time as the SE
- Additional invoice for furniture to complete the area
Fireplace Installation & Kitchen Remodel/Dishwasher
Seminar Room Remodel 2022
, multiple selections available,
Related content
LEAD Service Desk
LEAD Service Desk
More like this
3rd floor/4th floor Renovation
3rd floor/4th floor Renovation
More like this
Building Manager
Building Manager
More like this
March 12, 2021
March 12, 2021
More like this
Library Printing Space
Library Printing Space
More like this
Projects Summary
Projects Summary
More like this