Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 5.3

...

Table of Contents

Workgroup

Autumn Sunshine (Unlicensed user)

Beth Filar Williams (Unlicensed user)

Lori Hilterbrand (Unlicensed user)

Margaret Mellinger (Unlicensed user)

David Manela (Unlicensed user)

Josh Gum (Unlicensed user)

Brandon Straley (Unlicensed user)

Ryan Ordway (Unlicensed user)

Ben Miller (Unlicensed user)

Goals

Replace the failing thin-client patron access catalog computers and have a platform for the forthcoming LibNav interactive map on every floor.

...

  •  Establish timeline for project and concurrent projects
  •  Pick possible locations (assessment, lit review?) 
  •  Identify whether or not there are Ethernet ports in locations (elevator vestibule)
  •  Establish feasibility/desirability of hardware keyboard
  •  Establish approximate budget for project
  •  Figure out accessibility needs
  •  Create list of possible hardware options
  •  If we go with tablets figure out Ethernet access
  •  Talk to multimedia services about who makes their custom enclosures
  •  Decide what we want to purchase

...

Big KioskMedium KioskIpad/Android Tablet Kiosk
Standing Portrait Mode (like the Fairway we have'slab' style kiosks)Podium Style (consider accessibility issues)Podium Style Enclosure (consider accessibility issues)
Standing Landscape Mode ('slab' style kioskslike the Fairway we have)Adjustable Mount + Heavy Duty MonitorWall Mounted Enclosure
Podium Style (consider accessibility issues)  
Table Style (consider accessibility issues)  
Adjustable Stand/Podium/Table  
Adjustable Mount + Heavy Duty Monitor  

...

ModelManufacturerForm FactorSpecificationsAdjustablePer Unit CostUnits DesiredTotal Cost

Digital Lobby Kiosk Stand with Heavy Duty Weighted Base ($291.06)

Displays2go Standing Landscape Mode Y$2,971.064$11,885ish

Touch Screen Stand with Tilting Mount (approx. $370)

Displays2go Standing Landscape Mode Y$3,6504$14,600
Electric Lift & Tilt Mobile Stand (approx. $3700)
Salamander DesignsStanding Landscape Mode Y (powered)$6,9804$27,920

SmartMount Universal Kiosk Stand (approx. $674)

peerless-AVStanding Landscape Mode Y$3,3544$13,416

Collaboration Cart With Vertical Lift (approx. $3375)

peerless-AVStanding Landscape Mode Y (powered)$6,0554$24,220

KL546-S Indoor Kiosk Enclosure for 46 inch Screens (approx $1107)

peerless-AVStanding Landscape Mode N 4 

Cheap stand with tilt bracket $70 or $90 or $100

Displays2goStanding Landscape Mode Y 4 or more (2 per floor?) 
Broadcast model ( ? )Kiosk Information SystemsStanding Landscape Mode N 4( ? )
Trackmall or MaxpadApek technologiesStanding Landscape Mode YQuote/specs pending4 

Eclipse L

Kiosk InnovationsStanding Landscape Mode NDo we want to get a quote?4 
NavigatorMeridianStanding Landscape Mode NDo we want to get a quote?4 

FLOOR DISPLAY KIOSK

ZiveloStanding Landscape Mode NDo we want to get a quote?4 
KendoKiosks 4 businessStanding Landscape Mode NDo we want to get a quote?4 

Department Store Kiosk

FrankMayerStanding Landscape Mode N   
      

Placement

Do we want to get a quote?4 

Custom ( ? )

  • Elo touchscreen open-frame 32" $1300
  • Cardswipe $100
Local manufacturer? (probably landscape?) ? 4 

Placement

Brief report on ethernet in area outside avenue elevator vestibule:

FloorInfo
1Ethernet available, space available
2Ethernet available. Space available
3No junction box in the spot, but there is an ethernet port on the column to the left (from elevator vestibule) on the other side of the cube wall area. As long as that cube wall stays with all the re-arranging it should be fine to route a long cable along it. Confirmed cube wall will probably stay
4Kiosk placed already, ethernet available, not connected to ethernet
5Ethernet available, SCARC display in spot. Will follow up with SCARC
6Ethernet available, spot available

 

 Ideas:

  • Elevator vestibule
  • 2nd elevator vestibule
  • Stairway entrance at end of avenue
  • Old catalog computer spots (counter-top kiosk mounts?)
  • At ends of banks of study rooms (excluding 90 day rooms) (1 or both ends?)
  • In the stacks?