2019-11-21 Meeting Notes

Date

21 November 2019

Attendees

Discussion Items

ItemWhoNotes
Bridge Safety Essentials Training UpdateDon
  • Just a few quiz questions and audio to record
  • When finished Don will share with LAMP and other unit leadership to review
Accounting for Staff During an EvacuationBryan
  • Discussed creating an email to encourage all dept/units in the library to account for staff during a building evacuation
  • Basic guidelines include
    1. Evacuate the building
    2. Go to assembly area
    3. Dept./unit emergency coordinator (dept head, supervisor or designee) will account for all staff & student employees scheduled during that time.
    4. Dept/unit emergency coordinator will report to the building manager or designee located at the center of the library plaza (assembly area 1).
    5. Building manager or designee will report any issues to emergency personnel
  • Dept heads/supervisors should be knowledgeable of who is scheduled to work that day
  • Staff and student employees should be able to report at their assembly area within 5 min. after alarms sound.
  • Bryan will create a draft email
Potential Threat Procedures DraftBryan, Don
  • Reviewed a draft of Potential Threat Procedures as a follow up to the June threat evacuation
  • Made some revisions and Bryan will update
    • Will note that Strand Hall will be our evacuation building location. During evenings and weekends location will be in SEC plaza.
    • Need message template for whiteboards
    • Need steps if no action is taken
  • The document will be shared with LAMP next for review
Safety Kiosk Slides UpdateBryan
  • Committee needs to update our current safety oriented kiosk slides
  • Rachel and Elizabeth volunteered to work on these with the MU Creative Studio but others are welcome if interested.
  • Probably don't need until Septembers Safety Week
Floor Monitor TrainingBryan
  • Would like to proceed on plan to host in-house Floor Monitor Training provided by OSU Emergency Management
  • Presentation is about an hour long
  • Decided Jan. would be a good time as well as a possible In-Service presentation in Sept.
  • Bryan will check with OSU Emergency Management on possible dates and Don will create a staff survey to choose a date based on participation
Safety Essentials Training Policy DraftDon
  • Don created a draft policy to guide Safety Essentials training and the committee reviewed. Will share with LAMP and non-library units.

Action Items

  •